Wednesday, June 22, 2011

ROOF FRAME NEARING COMPLETION

 THE ROOF OVER THE CENTRE VILLA IS NEARING COMPLETION WITH THE INSTALLATION OF ALL THE CONVERGING RAFTERS, THIS STUNNING ROOF IS LOCATED OVER THE SEATING AREA IN VILLA TWO. THE WORKMAN HAVE DONE A TERRIFIC JOB OF FRAMING UP THIS SECTION OF THE ROOF AND WILL LOOK SENSATIONAL WITH THE BEDEG CEILING MATERIAL OVER THE TOP.


A VIEW OF THE FRONT AREA OF THE VILLAS WITH THE LARGE EAGLE BEAK GABLE OF VILLA TWO EXTENDING OUT TOWARDS THE ROAD (JALAN IN BALI).
THIS GABLE WILL HAVE TIMBER LOUVRES INSTALLED WHICH WILL ALLOW THE COOLING BREEZES INTO THE LIVING AREA OF THE VILLA.

CLICK ON ANY IMAGE TO ENLARGE AND SEE THE DETAIL MORE CLEARLY
THE VIEW FROM THE JALAN SHOWING THE ROOF OF VILLA ONE IN THE CENTRE AND VILLA TWO ON THE RIGHT HAND SIDE. THE TILED ROOF OF VILLA ONE BEDROOM CAN BE SEEN ON THE LEFT HAND SIDE. ALL THE RAFTERS SHOWN IN THIS PHOTO WILL BE EXPOSED FROM UNDERNEATH WITH THE WOVEN BAMBOO BEDEG CEILING MATERIAL OVER THE RAFTERS.

No comments:

Post a Comment