Sunday, April 24, 2011

AND THE WALLS GET HIGHER......

AFTER POURING THE FIRST CONCRETE RING BEAM, MORE BRICKWORK IS CONSTRUCTED READY FOR THE UPPER CONCRETE RING BEAM. THE TOTAL HEIGHT OF THE WALLS HERE WILL BE 3.4m. THE ROOF WILL BE PITCHED ON TOP OF THESE WALLS AND WILL BE AN OPEN STYLE ROOF (no ceiling) WITH ALL THE PITCHED TIMBER FRAMING EXPOSED TO THE LIVING AREA BELOW

No comments:

Post a Comment