Sunday, February 27, 2011

HAND DIGGING THE SECOND POOL

WORK COMMENCES ON THE EXCAVATION OF THE SECOND POOL. THIS HOLE WILL EVENTUALLY BE 7.0 x 4.0 METRES x 1.8 DEEP, THAT IS OVER 50 CUBIC METRES TO BE HAND DUG. ANY VOLUNTEERS TO ASSIST?

No comments:

Post a Comment